
Surface-Lay Poly Lines, Built Fast
When you need water moving this week, not next month. Poly fused and laid on the surface, with no ditch and no wait on dirt work.
Surface lay skips the trench. We fuse poly and lay it along the route on the ground, so a line can be up and under test in a fraction of the time a buried line takes. It's the right call for temporary transfer, completion water, and lines you plan to move or bury later.
Our crews run single and multi-line surface lays, handle crossings and road protection, and pull the line back up when the job's done.
What this scope includes
Service
- Produced water transfer
- Completion and frac water
- Temporary gathering
Install
- Single and multi-line surface lay
- Coiled pipe for speed
- Fast fusion
Crossings
- Road crossings and ramps
- Pipeline and lease road protection
Close-out
- Pressure testing
- Pick-up and recovery when the job's done
- Conversion to buried line
Why operators choose us for this work
Speed. Crews and fusion machines ready to mobilize from Midland.
Done right on the ground. Laid and secured to keep it in place and clear of traffic.
One call from lay to pick-up. We put it out and bring it back.
Other work we self-perform
Need water moving fast?
Tell us the footage and the deadline. We'll tell you how fast we can have it fused and on the ground.
