Encore crew truck at a fast fusion machine joining HDPE pipeline on a Permian lease
Fast Line on Surface

Surface-Lay Poly Lines, Built Fast

When you need water moving this week, not next month. Poly fused and laid on the surface, with no ditch and no wait on dirt work.

Overview

Surface lay skips the trench. We fuse poly and lay it along the route on the ground, so a line can be up and under test in a fraction of the time a buried line takes. It's the right call for temporary transfer, completion water, and lines you plan to move or bury later.

Our crews run single and multi-line surface lays, handle crossings and road protection, and pull the line back up when the job's done.

Capabilities

What this scope includes

Service

  • Produced water transfer
  • Completion and frac water
  • Temporary gathering

Install

  • Single and multi-line surface lay
  • Coiled pipe for speed
  • Fast fusion

Crossings

  • Road crossings and ramps
  • Pipeline and lease road protection

Close-out

  • Pressure testing
  • Pick-up and recovery when the job's done
  • Conversion to buried line
Why Encore

Why operators choose us for this work

01

Speed. Crews and fusion machines ready to mobilize from Midland.

02

Done right on the ground. Laid and secured to keep it in place and clear of traffic.

03

One call from lay to pick-up. We put it out and bring it back.

Need water moving fast?

Tell us the footage and the deadline. We'll tell you how fast we can have it fused and on the ground.

Request a Bid