Pad piping and header on concrete supports at a central tank battery built by Encore

Central Tank Battery & Facility Construction in the Permian Basin

Capabilities

What this scope includes

Tank batteries

  • setting tanks on ringwall pads, stairways, walkways and containment.

Pad piping and headers

  • fabricating and installing inlet and outlet headers on pipe supports.

Separation and measurement

  • setting separators, meter and LACT skids, pump and manifold skids.

Flowline tie-ins

  • bringing gathering lines into the battery and tying them over.

Site work

  • pads, concrete, bollards, fencing and grading.
Why Encore

Why operators choose us for this work

01

One contractor, flowline to facility

The crews that build the line into the battery build the battery.

02

Our own welders and fabrication

Headers, manifolds and spool pieces built by Encore, not bought in.

03

Our own iron

95%+ of the heavy iron on the job is ours, so the schedule is not waiting on a rental yard.

Tell us what you need built.

Request a Bid