Midland, Texas

Permian Basin Pipeline Contractors

Gas, crude, and produced water systems built by West Texas crews who know this basin: its soil, its regulators, and its operators. One contractor, flowline to facility.

We have finished every job we have ever started.

FEET OF PIPE INSTALLED

1982
Building Permian pipelines since
25+
years experience, management team average
25+
field crews, steel, poly & composite
3×
certified: ISNetworld, PEC, Energy Worldnet

Encore Pipe & Construction, LLC formed 2012.

What We Build

Full-service pipeline construction, one contractor

  • Poly Lines

    HDPE gathering and produced water line, fused and laid by our own crews

  • Steel & Composite Lines

    Steel and composite pipeline, right-of-way through tie-in

  • Fast Line on Surface

    Poly line fused and laid on surface

  • Pipeline Inserts

    New pipe inserted inside existing line

  • Facilities

    Tank batteries, pad piping and facility construction across the Permian

  • Welding & Fabrication

    Shop and field welding: headers, manifolds, spools and pipe supports, built by our own welders

  • Tie-Ins & Hot Taps

    Tying new line into existing systems, including hot taps

  • Pipeline Repair & Maint.

    Repair, replacement and ongoing maintenance on existing line

  • Pipe Procurement

    One PO, one schedule. We can procure the pipe

  • Gathering Systems & Flowlines

    Field-wide networks connecting wellheads to infrastructure.

  • Hydrovac Services

    Non-destructive excavation and safe daylighting.

Capabilities at a glance

Can we build it? Here's the short answer.

Line sizes

Poly (HDPE): 2" to 30" · Steel: up to 30" · Composite & spoolable: 2" to 30"

Service area

Within about 200 miles of our Midland yard: Midland Basin, Central Basin Platform and Delaware Basin, both the Texas and New Mexico sides.

Our iron

95%+ of the heavy iron on our jobs is ours: excavators, dozers, rock trenchers, fusion machines, hydrovacs and welding rigs.

Encore crew truck at a fast fusion machine joining HDPE pipeline on a Permian lease
Backhoe working caliche spoil on a pipeline right-of-way
Pipeline right-of-way under construction with excavators in the Permian Basin
Crews and iron across the Permian Basin.
25+
field crews, steel, poly & composite
80+
companies under MSA, upstream & midstream
95%+
of heavy iron on site is ours
Why Encore

West Texas built. Operator trusted.

Permian-specific, not national-generic

Built for this basin, not parachuted in from a national footprint.

One contractor, flowline to facility

From gathering systems to fabrication to facility work, no juggling subs.

247 workers credentialed in EWN

25+ field crews, steel, poly & composite. A stable workforce, not a labor-broker model. Operators know who's showing up.

Delaware Basin, both sides of the line

Serving the Texas and New Mexico sides of the Delaware Basin.

In the Field

Real crews. Real iron. Real Permian dirt.

Motor grader preparing a pipeline right-of-way with a pump jack in the distance
Wheel trencher piling red spoil beside a gathering line ditch
Large-diameter pipe strung along the right-of-way, seen from an equipment cab
Bell hole excavation with a compact loader and steel pipe for a pipeline crossing
Tank battery with storage tanks, a separator and piping behind yellow safety bollards
Pump and manifold skid with valves, flanges and instrumentation
Central tank battery and gathering header on a West Texas lease with pump jacks nearby
Auger boring equipment aligned with steel pipe for an underground crossing
Encore crew setting up an auger boring machine with steel casing in a bore pit
Encore trencher cutting a pipeline ditch through dusty caliche
Pipeline laydown yard with excavator, telehandler and strung pipe

Our people go home safe every night.

That's not a policy. It's a commitment held through millions of man-hours in the Permian. ISNetworld, PEC, and Energy Worldnet certified.

Our Safety Record
Careers

We're hiring across the Permian.

Welders, equipment operators, laborers, and foremen. Built by West Texans, still led by West Texans.

View Openings
Sunset over the Permian Basin with a drilling rig on the horizon

Tell us what you need built.

Your project has specific demands. Our crews have specific skills. We've been building Permian pipelines since 1982.

Request a Bid